Features |
|||
• Space out Base Jacks, Plane bases or Socket base / Spigot Jack assembly as per layout on the shop drawing provided.
• Fix a Standard on the Base Jack and two Ledgers at the Lowest joint of the standard at the right angles to each other as per sizes specified in the drawing. Do not tighten.
• Attach another Standard adjacent to the first Standard and fix the Ledger to the joint. Repeat this with a third Standard and complete a right angled corner.
• Add another standard and two Ledgers and complete a square / rectangle formation.
• Add another layer of Ledger on top of the previous one at intervals as shown on the provided shop drawing. Fix Spigot Jacks on the top of the Standards to take on the Drop Head and fix diagonal bracings as per the shop drawings.
• Now add the Decking and infill Beams to complete the decking layout. Hammer tighten all the joint castings.
Erection Sequence (for 4 standards and 2 Beams) |